Posts

Showing posts with the label IG SYSTEM MEO CLASS4 MMDORALS

STARTING OF IG SYSTEM& IG PLANT PARTS AND FUNCTIONS

  Starting of IG System Boiler should be on. Set the line for deck seal pump  Set the line for scrubber pump Set the line for O2 analyser. Set the line on blower, Now put the breaker to on position.  Ig starts & running. Function of ig parts. Scrubber tower: Gas will be cooled down to working temperature. Solid particles will removed  Soluble gas and Sox and carbon gases set mixed with water and draun out. Demister    Demister made on wire gauge. Act as a water absorbent. It Moisture will removed and gas will br dry. Blower There will be two blower . One for stand by another one will send the gas freeing to cargo tank. Pressure regulator valve  It regulates ig pressure asper discharge rate of cargo and maintain always  positive pressure inside the tank. O2 analyser . It will analyse the oxygen content flowing with gas  Temperature recorder. If ig gas above 57°c it will not allow the gas to cargo tank. Bleed valve  Its a three way valve  .if o2 content is High in ig gas it will open