STARTING PROCEDURE OF PURIFIER
- Switch on the electrical motor
- Wait ror 10-15 mint for the purifier to reach it's operational speed (check the ammeter for load on the motor,the current will reduce once the the purifier reached it's operational rpm)
- Supply sea water( sealing water) by open the sea water line valve.
- Check the water outlet of purifier, if the water seal is formed.
- Now close the sea water valve (sealing water)
- Supply the oil into purifier (through the heater if it is heavy oil or lub oil)
- Open the operating water line,and keep the line on,.
- Now purifier is in operation, absorb the oil delivery through the oil line by looking at the sight glass.
SLUDGE OUT PROCEDURE.
- Close the supply of fuel (also heater)
- Form the seal.
- Open de-sludge water by opening the valve.
- When you hear the hissing noise and see the loas on the motor while high,
- shut the de-sludging valve.
- That means de-sludging has been carried out.
- Now absorb for the motor to be in it's normal load this means the purifier is ready for it's operation
- Now follow the starting procedure 3 to 8
Comments
Post a Comment