CLASSIFICATION OF BULKHEADS MEO CLASS 4

 CLASS A 

  •  FORMING AS A BULKHEADS DECKS 
  • MADE OF STEEL OR OTHER SUITABLE MATERIAL.
  • ONE HOUR STANDARD FIRE TEST FOR PREVENT THE PASSAGE OF SMOKE AND FLAME.
  • INSULATED BY NON COMBUSTIBLE MATERIAL.
  • MINIMUM TEMPERATURE ON  UNEXPLORED SIDE SHOULD NOT RISE ABOVE 139° C.
  • POINT TEMPERATURE ABOVE 180°C
  • A60 - 60 MINUTES
  • A30 - 30 MINUTES
  • A15 - 15 MINUTES
  • A0 - 0 MINUTES


CLASS B 

  • FORMING BY A BULKHEADS DECKS AND CEILING AND LINING.
  • 30 HOURS STANDARD FIRE TEST OF FLAME 
  • UNEXPLORED TEMPERATURE 139°C ABOVE ORIGINAL
  • POINT TEMPERATURE RISE MORE THAN 225°C 
  • NON COMBUSTIBLE MATERIAL 
  • B15 - 15 MINUTES
  • B0 - 0 MINUTES


CLASS C 

  •  CONSTRUCTED AS A DECK 
  • APPROVED BY SOLAS AND CLASSIFICATION SOCIETY AS A NON COMBUSTIBLE MATERIAL.
  • NOT REQUIRED TO STANDARD FIRE TEST.




SEEMP SHIP ENERGY EFFICIENCY MANAGEMENT PLAN MEO CLASS 4

 SEEMP 

  •  SEEMP is designed to achieve better energy efficiency
  • Ship efficiency management plan provide a mechanism to improve the energy efficiency of the ship in a cost effective manner.
  • SEEMP made mandatory for all the ship as per MARPOL  

SEEMP divided into two parts 

 part A :

 ship specific measure that have been adopted by company to improve energy efficiency.

  •  FUEL EFFICIENCY OPTIMIZATION
  • WEATHER ROUTINE
  • DRAFT AND TRIM OPTIMIZATION
  • PROPELLER AND HULL CLEANING
  • SPEED OPTIMIZATION
  • TIME MAINTENANCE


PART 2:

Applicable for the all ship of 5000gt and above.

Should collect the data .

 

  • TYPE OF FUEL CONSUMED 
  • AMOUNT OF EACH FUEL CONSUMED
  • DISTANCE TRAVELED
  • HOURS UNDER WAY.


BOILER MOUNTINGS

 Internal mountings.

  • O gee ring 
  • Demister
  • Ring and distributor 
  • Fusible plug 

  • External mountings 
  • Pressure gauge
  • Steam stop valve 
  • Auxiliary steam stop valve 
  • Bottom blow down valve 
  • Scum blow down valve 
  • Safety valve 
  • Salinometer valve 
  • Feed checker valve 
  • Gauge glass 
  • Vent 










Difference between smoke tube and water tube boiler.?

 SMOKE TUBE BOILER 

  •  LOWER RATE OF EVAPORATION
  • LOW PRESSURE BOILER 
  • LESS COMPACT SIZE 
  • GAS PASSES THROUGH TUBES 
  • USED FOR LOW STEAM  DEMAND AREA 
  • NORMAL QUALITY OF WATER CAN USE 
  • MORE STORAGE CAPACITY OF STEAM.


WATER TUBE BOILER

  • HIGH RATE OF EVAPORATION
  • HIGH PRESSURE BOILER 
  • COMPACT SIZE
  • USED FOR HIGH DEMAND AREA
  • WATER QUALITY SHOULD BE GOOD 
  • LOW STEAM HOLDING CAPACITY.











Ship security officer (sso) meo class4 exam

 Ship security officer is the person onboard . He is designed by the company, he is responsible for the security of ship. Including implementation and maintenance of ship security plan  and he will be direct contact with cso and pfso.


Duties and responsibilities of sso.

  • Proposing modification in ssp 
  • Reporting all security incident
  • Ensuring security equipments are in operation 
  • Ensuring adequate training provided to onboard persons.




What are the documents on ship as per solas & marpol & stcw

Documents

 

  • Ship construction drawing
  • Ship construction file
  • Coating technical file (what kind of paint)
  • Stability information 
  • Damage stability
  • Fire control plan booklet
  • Fire safety operational booklet
  • Maintenance plan
  • Training manual
  • Onboard training & drill record
  • Narical chart & publications
  • IAMSAR
  •  Record of navigation activities
  • Manoeuvring booklet.
  • Ais test report
  • Record of rest hours
  • Ship safety an ans procedure for recovery of the person from water.
  • Oil Record Book
  • MSDS of all cargo
  • SOPEP
  • Garbage management plan.
  • Cargo secure manual
  • Ship security plan and associated record.
  • Fuel oil change over procedure.
  • Bunker Delivery note and sample
  • SEEMP
  • Log book
  • EEDI technical file
  • Nox technical file.
  • Record book of engine parameters.
  • Noise survey report.
  • Ozone depletion substance record
  • Search and rescue co operation plan 
  • List if operational limitations
  • Decision support system for master.
  • Enhance survay report file.
  • Cargo information.
  • Ship structure access manual.
  • COW operation experiment.
  • Subdivision and stability information
  • SIS operation plan and record of STS
  • Voc management plan.
  • Record of oil discharge
  • Oil discharge monitoring control system manual.
  • ODMCS operational manual.
  • Ship board marine Pollution emergency plan.
  • Procedure and arrangements manual.



Please we need your review. Please post your opinion in  Comment box