Ship security officer (sso) meo class4 exam

 Ship security officer is the person onboard . He is designed by the company, he is responsible for the security of ship. Including implementation and maintenance of ship security plan  and he will be direct contact with cso and pfso.


Duties and responsibilities of sso.

  • Proposing modification in ssp 
  • Reporting all security incident
  • Ensuring security equipments are in operation 
  • Ensuring adequate training provided to onboard persons.




What are the documents on ship as per solas & marpol & stcw

Documents

 

  • Ship construction drawing
  • Ship construction file
  • Coating technical file (what kind of paint)
  • Stability information 
  • Damage stability
  • Fire control plan booklet
  • Fire safety operational booklet
  • Maintenance plan
  • Training manual
  • Onboard training & drill record
  • Narical chart & publications
  • IAMSAR
  •  Record of navigation activities
  • Manoeuvring booklet.
  • Ais test report
  • Record of rest hours
  • Ship safety an ans procedure for recovery of the person from water.
  • Oil Record Book
  • MSDS of all cargo
  • SOPEP
  • Garbage management plan.
  • Cargo secure manual
  • Ship security plan and associated record.
  • Fuel oil change over procedure.
  • Bunker Delivery note and sample
  • SEEMP
  • Log book
  • EEDI technical file
  • Nox technical file.
  • Record book of engine parameters.
  • Noise survey report.
  • Ozone depletion substance record
  • Search and rescue co operation plan 
  • List if operational limitations
  • Decision support system for master.
  • Enhance survay report file.
  • Cargo information.
  • Ship structure access manual.
  • COW operation experiment.
  • Subdivision and stability information
  • SIS operation plan and record of STS
  • Voc management plan.
  • Record of oil discharge
  • Oil discharge monitoring control system manual.
  • ODMCS operational manual.
  • Ship board marine Pollution emergency plan.
  • Procedure and arrangements manual.



Please we need your review. Please post your opinion in  Comment box

SHIP'S CERTIFICATE AS PER SOLAS AND MARPOL AND STCW



  • Tonnage certificate
  • Load line certificate
  • Load line exemption certificate
  • International ship security certificate
  • Continues synopsis record.
  • Minimum safe manning documents .
  • Certificate for master & officers & ratings
  • Document of compliances.
  • Safety management certificate

  • International oil Pollution prevention certificate.
  • International Pollution prevention certificate for carriage of noxic liquid substance in bulk.
  • Document of compliances with special requirements ship carrying dangerous goods.
  • International sewag Pollution prevention certificate.
  • International energy efficiency certificate.
  • International air Pollution prevention certificate.
  • Engine International air Pollution prevention certificate.
  • International anti fouling system certificate.
  • Declaration of anti fouling system.
  • Voyage data recorder.
  • Passanger ship safety certificate
  • Special trade passanger ship safety certificate and special trade passanger ship space certificate.

  • Cargo ship safety certificate.
  • ✅Cargo ship safety construction certificate.
  • ✅Cargo ship safety equipment certificate.
  • ✅Cargo shil Safety radio certificate.

  • Document of Authorization for carriage of grain & grain loading manual 
  • Certificate of insurance or other financial security in respect of civil liability for oil Pollution.
  • Certificate of insurance or other financial security in respect of civil liability for bunker oil Pollution
  • Certificate of fitness.

(After reading please comment what is ur opinion about post which will help us to improve this platform.)

BOILER GAUGE GLASS BLOW THROUGH

 GAUGE GLASS BLOW THROUGH


  • SHUT THE STEAM SIDE VALVE 
  • SHUT THE WATER SIDE VALVE 
  • NOW OPEN THE DRAIN VALVE 
  • NOW GAUGE GLASS BECOME EMPTY.
  • NOW OPEN THE STEAM SIDE VALVE ,IF STEAM COME OUT WITHOUT ANY DEFICIENCY WHICH MEANS STEAM SIDE IS CLEAR .
  • NOW CLOSE THE STEAM SIDE 
  • OPEN THE WATER SIDE, IF WATER  WILL COME OUT WITHOUT ANY DEFICIENCY WHICH MEANS  WATER SIDE IS CLEAR.
  • NOW CLOSE THE WATER SIDE 
  • AND CLOSE THE DRAIN VALVE.
  • NOW OPEN THE WATER SIDE FIRST, WATER WILL RISE AND FILL UP THE GAUGE GLASS.
  • NOW OPEN THE STEAM SIDE STEAM WILL COME INTO GAUGE GLASS AND SHOW THE EXTRACT LEVEL OF INSIDE  BOILER WATER.


Notes

SURVIVER MAY ASK YOU OPEN WATER SIDE FIRST 

(If we open steam side first gauge glass will breake because of lantern heat.)


2/S Cross-Head Engines Vs 4/S Trunk Piston Engines

 






STARTING OF IG SYSTEM& IG PLANT PARTS AND FUNCTIONS

 Starting of IG System

  • Boiler should be on.
  • Set the line for deck seal pump 
  • Set the line for scrubber pump
  • Set the line for O2 analyser.
  • Set the line on blower,
  • Now put the breaker to on position.
  •  Ig starts & running.


Function of ig parts.


Scrubber tower:

  • Gas will be cooled down to working temperature.
  • Solid particles will removed 
  • Soluble gas and Sox and carbon gases set mixed with water and draun out.


Demister 

  •  Demister made on wire gauge.
  • Act as a water absorbent.
  • It Moisture will removed and gas will br dry.


Blower

  • There will be two blower .
  • One for stand by another one will send the gas freeing to cargo tank.


Pressure regulator valve 

  • It regulates ig pressure asper discharge rate of cargo and maintain always  positive pressure inside the tank.


O2 analyser.

  • It will analyse the oxygen content flowing with gas 


Temperature recorder.

  • If ig gas above 57°c it will not allow the gas to cargo tank.


Bleed valve 

  • Its a three way valve  .if o2 content is High in ig gas it will open the valve send the gas to atmosphere.


Deck seal.

  • It is a non return valve.which will not alow the gas back.


Non return valve.

  • Secondary valve . preventive the back flow of gas.


Pv valve

  • Safety fitted in the tank to prevent the exclusive vacuum and pressure build-up in the cargo tank it will release the pressure to atmosphere.


Pv breaker.

  • Which is fitted in common ig line. When suddenly increase of vacuum and pressure it will open and release the pressure and vaccum.


Mast valve 

  • Common ventilating system for cargo tanks . While loading and unloading it should be open.


Deck isolation valve.

  • It will isolates the ig line from ig plant.


Vapour line 

  • To receive shore supply of ig gass 
  • To discharge ig gas to shore storage tank