CO2 Fixed Fire Fighting System

 Co2 BOTTLE REGULATION 

  • Ship of 200gt and above and machinery space of 500m3 and above should have fixed fire fighting System.
  • 85% of co2 will release within 2 mint (REASON- THE RAPID INJECTION OF CO2 IS NECESSARY TO COMPACT AN ENGINE ROOM FIRE, WHICH HAS ATTENDED TO SUCH MAGNITUDE THAT SPACE TO EVACUATED.)
  • co2 bottle  kept in the temp of below 55°C.
  • Co2 bottle normal pressure 53bar it will differ by temperature.
  • Without sypton tube will ensure that fully discharge of co2. (Without sypton tube low discharge and bottle will freeze because of lantern heat .
  • Busting disk will rupture 177 bar @ temperature of 63°C .
  • Once co2 will release in a space oxygen percentage will reduce below 15%.
  • Co2 bottle checked by isotropic gun for weighting.

CO2 ROOM REGULATION 

  • Co2 room should not used for other purposes.
  • Co2 room should be in one deck below the open deck . Stairway or lader should be provided.
  • Co2 room door should be open  outward.
  • Mechanical ventilation should be provided .
  • Ventilation should be 6 air change per hours.
  • Co2 room temperature maintenance below 55°C.
  • Co2 room height should be 2.4 m .


SAFETY ON CO2 BOTTLE 

 Trip switch

  •    It will cut off the ventilation
  •   And start audible and visible alarm.


Master valve 

  •  On main manifold line. Which is going ro machinery space or cargo space.
  • It will not allow the co2. if accidentally release.


Relief valve:

  •   It will located on end of the manifold.
  • It will lift manifold pressure is exceeded. 


Safety pin :

  •  It will be in bottle head assembly.


Busting disk:

  •  It will also in bottle head assembly.


Non return valve:

  •  Located between bottle head and manifold.
  • It will not allow the back flow of co2 when specific bottles are in operation.


Co2 leak alarm:

  • It will located on nthe manifold.
  • It will work @ 4 bar.

  

Maintenance and check on Co2 System 

 Check all cylinders are properly secured.

Check all cylinder's operating leavers.

Check clamping.

Flexible hose should be checked.


Monthly:

 All the above

Open cabinet check for alarm and ventilation trips.


Yearly:

 All the above 

Blow the System with service.


2 years:

 All the above 

Weighing  the bottles 


5 years:

 All the above

Spring loded relief valve pressure test 180bar.


10 years:

Cylinder pressure test 

After 10 years pressure test the cylinder every 5 years.


15years:

Pressure testing the line.

Cylinder to master valve @ 170bar.

Master valve to E/R or cargo hold @ 80bar

E/R and Cargo hold to nozzls @ 6-7 bar











Comments

Popular posts from this blog

STIFF SHIP AND TENDER SHIP and Difference between stiff and tender ship.

SOLAS CHAPTER 11.1 SPECIAL MEASURES ENHANCE TO MARITIME SAFETY (MEO CLASS4)

BOILER ALARMS AND TRIPS